The Ultimate Guide to CBG Plant Setup: Start Your Green Energy Business Today

CBG Plant Setup

As India accelerates toward a cleaner energy future, CBG plant setup is emerging as a lucrative and sustainable investment opportunity. With strong government support, abundant raw material availability, and increasing fuel demand, setting up a CBG plant today is both an eco-friendly and economically viable choice.

โœ… Looking to set up a CBG plant? NetZero India offers turnkey solutions including consultancy, approvals, construction, and ongoing support.


๐Ÿ” What is a CBG Plant and Why is Setup Crucial?

A CBG plant uses organic waste like cow dung, agricultural residue, and food waste to produce biogas via anaerobic digestion. This gas is then purified and compressed to form Compressed Biogas (CBG), a clean, renewable fuel.

The CBG plant setup process ensures that all componentsโ€”from digester tanks to bottling unitsโ€”are correctly integrated, approved, and optimized for long-term operation.


๐Ÿ—๏ธ Step-by-Step Guide to CBG Plant Setup

1. Feasibility Study and DPR Creation:

  • Assessment of raw material availability
  • Site selection
  • Detailed Project Report (DPR)

2. Government Approvals and Subsidies:

  • SATAT scheme registration
  • State pollution and safety clearances
  • Capital subsidy applications (GOBARdhan, MNRE, etc.)

3. Engineering, Procurement, and Construction (EPC):

  • Civil work: digester tanks, gas storage
  • Mechanical: gas scrubbers, compressors
  • Electrical: control panels, automation systems

4. Testing and Commissioning:

  • Quality checks
  • Safety certifications
  • Plant handover

NetZero India supports all phases to make the setup process smooth and scalable.


๐Ÿ’ฐ Cost of CBG Plant Setup

The cost of setting up a CBG plant can range between:

  • โ‚น1.5 Cr for small-scale (2 TPD)
  • โ‚น8-12 Cr for medium-to-large (10-15 TPD)

Factors affecting cost:

  • Type and quantity of feedstock
  • Land and infrastructure
  • Equipment & automation levels
  • Regulatory and transport needs

Read More: CBG Turnkey Solutions by NetZero India


๐Ÿ”ง Machinery and Components in CBG Setup

A standard CBG plant includes:

  • Pre-treatment systems (shredders, mixers)
  • Anaerobic digesters
  • Biogas scrubbers (H2S, CO2 removal)
  • Gas compressors & bottling units
  • Bio-slurry separation units
  • Automation & SCADA controls

NetZero India sources high-efficiency, durable equipment to ensure uninterrupted operations and long-term ROI.


๐Ÿ“Œ Advantages of Choosing NetZero India for CBG Setup

NetZero India is a reputed CBG plant developer offering:

  • Turnkey EPC and O&M contracts
  • SATAT & subsidy application support
  • On-site staff training and post-installation service
  • Assistance in CBG offtake agreements with OMCs

From site survey to gas sale, NetZero India stands as your strategic partner.


๐ŸŒ Location-Based Setup Services

NetZero India offers CBG plant setup services across India:

  • Gujarat: Industrial and dairy-focused setups
  • Maharashtra: Urban waste to CBG solutions
  • Punjab & Haryana: Agricultural residue-based plants
  • Tamil Nadu: Municipal and agro-waste utilization

โœ… Why CBG Plant Setup is a Smart Investment

  • 100% FDI allowed in renewable energy
  • Long-term CBG purchase agreements
  • Growing demand for green transport fuel
  • Opportunity to earn carbon credits

By partnering with NetZero India, you ensure that your investment turns into a profitable, sustainable business.


๐Ÿ“š Read More from NetZero India


โ“ FAQs

How long does CBG plant setup take?

Typically 6 to 12 months, depending on capacity and approvals.

What is included in NetZero Indiaโ€™s turnkey service?

Feasibility, DPR, subsidies, EPC, training, and after-sales support.

Can I upgrade an existing biogas plant to CBG?

Yes, NetZero India specializes in biogas to CBG conversion modules.

How much land is required?

Around 0.5 to 2 acres, based on plant size and storage facilities.

Is CBG profitable?

Yes. With subsidies, offtake agreements, and low raw material costs, CBG offers excellent ROI.


๐Ÿท๏ธ Tags

CBG plant setup, CBG setup service, CBG plant installation, CBG turnkey project, compressed biogas plant, CBG gas plant, biogas to CBG, invest in CBG, NetZero India, SATAT scheme, GOBARdhan subsidy, CBG India, renewable fuel, organic waste, waste to energy


Sources:

Share Now

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Posts